Ola Completes TGE and Final Season Snapshot of Massive Ahead of Mainnet
On October 10, Ola, the ZK cross-chain infrastructure project, announced that its node validation network, Massive, has concluded its three seasons of activity in the test network phase. As of the third season, the Ola Massive network has totaled more than 250,000 validators' participation. The project is in the process of reviewing the snapshot results to determine airdrop eligibility ahead of the upcoming TGE.
Disclaimer: The content of this article solely reflects the author's opinion and does not represent the platform in any capacity. This article is not intended to serve as a reference for making investment decisions.
You may also like
Goldman Sachs lifts Adtran Holdings voting rights to 5.36% from 4.61%
Bitcoin and Altcoins Have Surged, but an Analyst Warns: These Levels Could Trigger Major Moves
SemiAnalysis: Flash memory manufacturing is “switching from tungsten to molybdenum”
SemiAnalysis reports that after surpassing 300 layers in 3D NAND flash memory stacking, tungsten word lines have reached their physical limits in terms of resistance, chemical compatibility, and deep hole filling, making molybdenum a mandatory replacement material. Samsung began mass production in 2024, Micron will follow in 2025, and SK Hynix plans to launch 375-layer molybdenum process products by the end of 2026. The molybdenum deposition equipment market is expected to achieve sales of over $1 billion by 2027.
Obook Holdings posts transcript of 1H 2026 earnings call