The public chain project Metabit Network announced that it will carry out a BMTC staking airdrop campaign
On March 2nd, the public chain project Metabit Network announced that in 2024, it will carry out Restaking as Rollup technology iteration. The newly added staked BMTC by users will all be restaked to the AVS integrated verification service of a specially designated node to achieve faster data validation and data availability for intermediate layer services (such as oracles, cross-chain bridges, virtual machines). Users who participate in this staking contribution and meet the staking requirements will receive joint airdrop rewards from the foundation and partner institutions. This activity is jointly organized by Metabit Foundation with important ecological partners and institutional investors DG Capital and BM FUND.
1. Activity start date: 3 days after the official announcement day of the activity with snapshot.
2. Activity reward categories include:
- 1) During the activity period, addresses that meet staking requirements will share 5% of the total increase in BMTC stake as an airdrop for all users on the network (for individual stake increments at each address), distribution method will be determined based on individual address weight;
- 2) New light node addresses share airdrop of 20,000 BMTC;
- 3) Light nodes share net increment of 10%;
- 4) Directly invited upline receives 10% of invitee's staked amount.
3. Staking valid requirements include:
- Regular users (delegators): Wallet address participating in activities must have stake quantity greater than or equal to 300 BMTC;
- Light node users: Participating valid addresses must have stake quantity greater than or equal to1500 BMTC;
- Existing stakers/light nodes: Stake not removed within last30 days.
Disclaimer: The content of this article solely reflects the author's opinion and does not represent the platform in any capacity. This article is not intended to serve as a reference for making investment decisions.
You may also like
Australian Dollar reacts little to dismal jobs data; holds above weekly low vs weaker JPY
Camera-equipped AirPods Pro 3 rumor turns out to be a false leak! Supply chain challenges remain unresolved, Apple (AAPL.US) still targets a 2027 release for its new AI earphones
Despite reports that Apple may accelerate its plan to launch AirPods equipped with cameras, the plan is still scheduled to be implemented in 2027 as originally planned.

Storage capacity negotiations scheduled until 2030! Winbond Electronics initiates expansion plans ahead of schedule
Winbond Electronics has initiated an early expansion plan for Module B at its Lujhu plant in Kaohsiung, with construction expected to begin in 2027 and equipment installation in 2029. Customer capacity negotiations have already been scheduled through 2029 to 2030. The institution believes that AI-driven demand for storage will “continue for quite a long time.” In addition, Winbond has invested approximately 4 billion yuan in the silicon capacitor production line, with mass production expected as early as 2027. This is regarded as a third growth driver beyond logic and storage.
Irani Papel e Embalagem issues BRL 300 million credit note with Bradesco